20.05.2010 Transport and Placement of the 10m high drying tower part.
The base part of the new drying tower (12t weighing, 8,50 m diameter and 10m high) was transported over the premises of the Müller Milch in Leppersdorf and was placed with the mobile crane 200t and wrecking crane 100t.
more...
8.02.2010 Installation of Evaporator at Muller Milk
At Muller Milk in Leppersdorf, two evaporators (28m in length and 2.5 m in diameter) weighing 45 t and 12t had to be brought in through an opening in the roof.
more...
1.10.2009 Tower slewing cranes for sale
We are now selling used tower slewing cranes. Top-slewing and self-erecting cranes from the company Liebherr are available.
more...